Clonoulty Village, Clonoulty, Co. Tipperary

RESIDENTIAL LICENSED PREMISES PUB ACC COMPRISES:Bar /Lounge 16m x 4.3m Small Bar 5.5m x 3.4m Ladies & GentsStorage Area & Keg RoomKitchen 4.5m x 2.7m Tiled & FittedUtility 2.2m x 2m Sittingroom 4.7m x 3.4m First FloorBedroom 1 3.7m x 3.2mLivingroom 3.5m x 4.2mBedroom 2 3.5m x 4.2mBedroom 3 3.6m x 3mBathroom 3m x 3.2mOUTSIDE: Spacious Car Park

Elton, Elton, Co. Limerick

Circa 60 Acres – Non- ResidentialTop Quality LandIn two Division (Divided By Road)Extensive Road Frontage 750m x 450m5 Column Barn, Cubicle Shed, Crush, Silage PitWell Fenced ThroughoutMains Water & Electricity SupplyFull Details On Request

Knocklong Village, Knocklong, Limerick

SUBSTANTIAL DEVELOPMENT SITE EXTENDING TO 2.5 ACRES -Residence (In need of Renovation) -Commercial Building (Formerly Bakery) – Range of Out-Offices -Yard to Rear (With Development Potential) -Building Extending to Circa 6000 Sq ft Property located in heart of village and is suitable for a wide variety of Enterprises TO VIEW OR MAKE A BID Please contact Wheeler Auctioneers on 061 383403 or www.munsterpropertyauction.ie, 021

Croom , Croom, Limerick

• Landmark Property within environs of Town • Former Railway Site • Site extending to 2.7 Acres • Main Building extending to 4,000 Sq ft approx. • Road Frontage 900 ft • This property is suitable for variety of uses • Further details from agent

32 Main Street , Croom, Limerick

Tenant Not Affected * Ground Floor Commercial Unit (73.77m2) * 3 Bed Duplex Apartment Overhead (107.2m2) * 3 Bathrooms * Newly constructed building in 2000 * Off Street Parking *Separate access to Apartment Property comprises. Ground Floor – Shop/ Hairdressing Salon, Storeroom, Toilets First Floor – Kitchen/Living/Dining, Bedroom, Bathroom Second Floor – Bedroom, Ensuite, Bedroom and Bathroom

Fr. Russell Road, Dooradoyle, Limerick

8 ONLY DETACHED HOUSES (Only One remaining) – Substantial Two Storey Houses – Extending to Circa 222 sq.m. – A-Rated (Air to Water Heating System) – Generous Plots – High Specification Throughout Builders finish Estimated completion is Sept 2019